Description It is particularly suitable for joining on hardly weldable steels, when highest |
Description
Weld metal deposit analysis
Mechanical Test of weld Metal
Operating Data
- Welding instruction
Clean welding area thoroughly. Pre-heating of thick-walled ferritic parts to 150 – 250° C. Keep the arc short up
to medium-long. Apply string beads with little weaving. Hold stick electrode as vertically as possible. Re- dry stick
electrodes that have got damp for 2 h / 120 – 200° C.
Welding Positions
- All, except vertical down
Polarity
- AC & DC (+)



